Rothoblaas - X-RAD Page 17
Commercial customer offer**Top sellers from RothoBlaas Deutschland
COMPARISON PARAMETER HOLD-DOWN AND ANGLE BRACKET X-RAD SYSTEM connections fastening time (1) 15% TIME TIME 40% total construction time incidence of total labour costs (2) COSTS 75% transporting the panels 30% COSTS 100% 25% machining in the factory The X-RAD system moves most of the work from the building site to the factory, with increased prefabrication, greater efficiency, reduced times and optimisation of costs. Total assembly time TRADITIONAL X-RAD unloading installation fastening Connection systems NOTES: (1) Compared with the total construction time (2) Compared with the overall cost (materials + labour) These assessments resulting from analyses carried out on real building sites are approximate and generic estimates and, if necessary, shall be updated according to the specific case and type of construction involved. 15
84 Pages | Valid until 04/2024 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
