Rothoblaas - X-RAD Page 16
Commercial customer offer**Top sellers from RothoBlaas Deutschland
CONSTRUCTION TIMES Standardising and reducing the overall number of joints makes the XRAD system a winner when the construction times are a key factor in implementation of the work. These advantages were actually demonstrated when the first buildings were constructed using the XRAD system, where the time required for all of the operations needed to assemble the structure were carefully recorded and documented, and then by comparing it at the end with that required by a solution using traditional anchors. COMPARISON OF FASTENING TIMES BETWEEN THE XRAD SOLUTION AND TRADITIONAL ANGLE BRACKETS SAVING 50% - 70% X-RAD SYSTEM Average time required to install 1 X-ONE: about 5 minutes Total time required to fully position and assemble a wall (4 X-ONE in the factory + 4 X-PLATE on site): about 30 minutes TRADITIONAL SYSTEM Total time required to fully position and assemble a wall on site (fastening 4 WHT440 + 4 TCN240 + 4 TTN200): about 60 - 70 minutes 14
84 Pages | Valid until 04/2024 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
