Rothoblaas - X-RAD Page 57
Commercial customer offer**Top sellers from RothoBlaas Deutschland
X-ONE X-PLATE X-SEAL STEP 7 STEP 8 Tracing the positioning holes for the X-PLATE plates on site. Positioning the X-PLATE plates on the foundation base in reinforced concrete. STEP 9 STEP 10 The X-PLATE plates are positioned and levelled to the required height. The CLT panel, with the bottom edge aligned with the intrados of the plate, will continue to support the foundation. Once the plates have been positioned, the operator will drill a Ø24 mm hole in the reinforced concrete support for the subsequent insertion of the Ø20 mm chemical anchors. The fasteners adjacent to the vertical wings of the plate (A) must be installed before assembling the CLT walls, those furthest away (B) can be installed later. The tolerance between the diameter of the anchor and the hole in the plate, to be filled with structural resin, allows the position of the plate to still be adjusted. 100 70 A A A B B B B B B STEP 11 STEP 12 Positioning the base walls: X-ONE housing in the X-PLATE plates and connection with bolts, nuts and washers. Positioning the mid-floor walls and roof: X-ONE housing in the X-PLATE plates and connection with bolts, nuts and washers. NOTE: Video showing assemble of the system is available on www.rothoblaas.com. X-PLATE 55
84 Pages | Valid until 04/2024 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
