Eurotec catalogue fastening technology Página 199
Oferta para clientes comerciais**Produtos da página de catálogo
Timber engineering PediX post feet Technical data Name Art. no. Post feet on concrete Height adjustment in assembled state Min. post cross section Dimensions of baseplate Compressive Tensile loadbearing capacity loadbearing capacity [mm] [mm] H x L x W [mm] Nc,d [kN] Lateral force resistance1) PU Nt,d [kN] VR,d [kN] pcs. PediX 140+50 904681 140 - 190 100 x 100 8 x 160 x 100 48,0 9,2 – 4 PediX 190+100 904682 190 - 290 100 x 100 8 x 160 x 100 30,9 9,2 – 4 PediX 300+150 904689 300 - 450 100 x 100 8 x 160 x 100 16,2 9,2 – 4 PediX 140+50 HV 904681-HV 140 - 190 100 x 100 8 x 160 x 100 48,0 9,2 3,5 4 PediX 190+100 HV 904682-HV 190 - 290 100 x 100 8 x 160 x 100 35,4 9,2 2,9 4 PediX 300+150 HV 904689-HV 300 - 450 100 x 100 8 x 160 x 100 34,5 8,6 2,3 4 Height adjustability [mm] [mm] H x L x W [mm] Nc,d [kN] Nt,d [kN] VR,d [kN] pcs. PediX B500 904683 – 100 x 100 – 49,0 24 4,6 4 PediX B500+50 904686 50 100 x 100 – 44,9 23 – 4 Post feet in concrete 1) The lateral force resistance must be overlaid with the compressive and tensile load in accordance with ETA-13-/0550 and can therefore lead to lower load-bearing capacities. Please note: The stated values are only intended as planning aids. They are subject to typographical and printing errors. Projects must only be calculated by authorised persons. Height adjustment 50/100/150 mm Installation instructions: You will find more-detailed information in our installation instructions Gasket 12 x Ø 5 x 80 mm FT TX20 After centring the head plate, screw in the 12 A2 full-thread 5,0 x 80 mm screws at The PediX post foot can be attached easily to the end grain. Place the seal on the an angle of 25° without base plate. support foot and then place both parts centrally on the end grain surface. Note: To make assembly easier, the base plate and the cover sleeve can be unscrewed. Screwed socket AF30 The protective sleeve and the pillot drilling can be reinstalled after all screws are fitted. After the post is erected with the post foot installed, it can be anchored on a concrete foundation with two or four cavity-wall ties or concrete bolts. Once the foot is installed on the socket, its height can be adjusted using an AF30 spanner. Please note: Do not screw the post foot to a height greater than 190, 290 or 450 mm respectively. 199
444 Páginas | Válido até 12/2024 | Página anterior | Próxima página
Escolha a sua língua
Questões legais
O fabricante é exclusivamente responsável pelo conteúdo, pelo preço e pelos detalhes dos produtos e das ofertas apresentados nos catálogos. Sujeito a alterações técnicas e ópticas por parte do fabricante e com excepção de erros.
Formulário de pedido de produtos especiais
O serviço de aquisições de ToolTeam®
Está à procura de produtos que são mostrados no catálogo mas que não podem ser comprados diretamente online?O nosso serviço de aprovisionamento terá todo o prazer em fazer-lhe uma oferta individual e não vinculativa.
