ENERPAC - Bolting Tools Pagina 78
Commercieel klantenaanbod**Beste verkopers van ENERPAC
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
Multi-Stud Tensioning Tensioning Every Single Stud in a Joint Simultaneously MST - Multi-Stud Tensioners This tool can be custom designed, and built, for virtually any nuclear facility. We specialize in addressing difficult projects that demand accurate loads within tight space envelopes, while also seeking ease of operation and performance. ▲ Multi Stud Tensioning Set-Up. MULTI STUD TENSIONERS Enerpac Multi Stud Tensioning (MST) systems are capable of tensioning every single stud in a joint simultaneously. By applying a predictable and accurate preload to all studs, problems associated with conventional bolt tightening techniques are avoided. Typical Enerpac Multi Stud Tensioning applications include: • Designed in segments enabling the operator to easily and quickly connect each segment to the joint and link together to provide simultaneous loading. • Very accurate and fast closure system for large tensioning applications on pumps, valves, and steam generators, for example. • For ease of handling on-site, Enerpac MST systems can be supplied with an integral lifting frame and trolley. Manway, Hand Hole & Inspection Covers MST systems are the fastest and most accurate means of loosening and tightening studs on Primary and Secondary Manway Covers, Hand-Hole and Inspection Ports in nuclear facilities. Using special ram areas and strong lightweight materials, the MST’s reduce bolting time by as much as 75%. Coolant Pump A custom slimline tensioning system for a Nuclear Reactor Coolant Pump, using six equally spaced tensioners and tightening studs in four passes, has reduced bolting times by 25% and significantly increased tensioning accuracy. Wind Turbine Blade Assembly Using an Enerpac MST has allowed wind turbine blade assembly times to be reduced by approx. 65% while bolt load accuracy and consistency have improved, resulting in better joint life and reduced maintenance requirements. The MST, comprising four tool segments, is capable of simultaneously tensioning up to 88 bolts connecting a 125 ft long blade to a bearing slew ring. ▲ Multi-Stud Tensioner. ▲ Multi-Stud Tensioning application. 76 www.enerpac.com
136 Pagina’s | Geldig tot 12/2023 | Vorige pagina | Volgende pagina
Kies uw taal
Juridische kwesties
De fabrikant is exclusief verantwoordelijk voor de inhoud, prijs en artikeldetails van de producten en aanbiedingen in de catalogi. Technische en optische wijzigingen door de fabrikant en fouten voorbehouden.
Aanvraagformulier voor speciale producten
De ToolTeam® Inkoopservice
Bent u op zoek naar producten die wel in de catalogus staan maar niet direct online te koop zijn?Onze aankoopdienst zal u graag een niet-bindend en individueel aanbod doen.
