ENERPAC - Bolting Tools Pagina 127
Commercieel klantenaanbod**Beste verkopers van ENERPAC
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
excl. verzending
Tensioning Manufacturer’s rating of pressure and load are maximum safe limits. Good practice encourages using only 80% of these ratings! Tensioning Operation Tensioning permits the simultaneous tightening of multiple bolts; the tools are connected in sequence via a highpressure hose assembly to a single pump unit. This ensures each tool develops the exact same load and provides a uniform clamping force across the joint. This is especially important for pressure containing vessels requiring even gasket compression to affect a seal. General Procedure Set-up Using a 100% Tensioning Procedure All bolts are tensioned simultaneously. Step 1 Step 2 Step 1: The bolt Tensioner is fitted over the stud. Step 2: Hydraulic pressure is applied to the tensioner which then stretches the stud. Step 3: The Stud’s nut is wound down against the joint face. Step 4: Pressure is released and the tool removed. Step 3 Step 4 The bolt behaves like a spring, when the pressure is released the bolt is under tension and attempts to contract, creating the required clamping force across the joint. Less than 100% Tensioning Not all applications allow for the simultaneous fit of a tensioning device on each bolt, in these cases at least two tensioning pressures are applied. This is to account for a load loss in those bolts already tensioned as the next sets are tightened. The load losses are accounted for in calculation and a higher load is applied to allow the first sets to relax back to the target preload. Set-up Using a 50% Tensioning Procedure Half the bolts are tensioned simultaneously, the tools are relocated on the remaining bolts and they are subsequently tensioned. Read Instruction Manuals Please refer to the product Instruction Sheets for safe use guidelines and detail on the correct set up and operation of the equipment. 125
136 Pagina’s | Geldig tot 12/2023 | Vorige pagina | Volgende pagina
Kies uw taal
Juridische kwesties
De fabrikant is exclusief verantwoordelijk voor de inhoud, prijs en artikeldetails van de producten en aanbiedingen in de catalogi. Technische en optische wijzigingen door de fabrikant en fouten voorbehouden.
Aanvraagformulier voor speciale producten
De ToolTeam® Inkoopservice
Bent u op zoek naar producten die wel in de catalogus staan maar niet direct online te koop zijn?Onze aankoopdienst zal u graag een niet-bindend en individueel aanbod doen.
