Eurotec catalogue fastening technology Pagina 199
Offerta per clienti commerciali**Prodotti della pagina del catalogo
Timber engineering PediX post feet Technical data Name Art. no. Post feet on concrete Height adjustment in assembled state Min. post cross section Dimensions of baseplate Compressive Tensile loadbearing capacity loadbearing capacity [mm] [mm] H x L x W [mm] Nc,d [kN] Lateral force resistance1) PU Nt,d [kN] VR,d [kN] pcs. PediX 140+50 904681 140 - 190 100 x 100 8 x 160 x 100 48,0 9,2 – 4 PediX 190+100 904682 190 - 290 100 x 100 8 x 160 x 100 30,9 9,2 – 4 PediX 300+150 904689 300 - 450 100 x 100 8 x 160 x 100 16,2 9,2 – 4 PediX 140+50 HV 904681-HV 140 - 190 100 x 100 8 x 160 x 100 48,0 9,2 3,5 4 PediX 190+100 HV 904682-HV 190 - 290 100 x 100 8 x 160 x 100 35,4 9,2 2,9 4 PediX 300+150 HV 904689-HV 300 - 450 100 x 100 8 x 160 x 100 34,5 8,6 2,3 4 Height adjustability [mm] [mm] H x L x W [mm] Nc,d [kN] Nt,d [kN] VR,d [kN] pcs. PediX B500 904683 – 100 x 100 – 49,0 24 4,6 4 PediX B500+50 904686 50 100 x 100 – 44,9 23 – 4 Post feet in concrete 1) The lateral force resistance must be overlaid with the compressive and tensile load in accordance with ETA-13-/0550 and can therefore lead to lower load-bearing capacities. Please note: The stated values are only intended as planning aids. They are subject to typographical and printing errors. Projects must only be calculated by authorised persons. Height adjustment 50/100/150 mm Installation instructions: You will find more-detailed information in our installation instructions Gasket 12 x Ø 5 x 80 mm FT TX20 After centring the head plate, screw in the 12 A2 full-thread 5,0 x 80 mm screws at The PediX post foot can be attached easily to the end grain. Place the seal on the an angle of 25° without base plate. support foot and then place both parts centrally on the end grain surface. Note: To make assembly easier, the base plate and the cover sleeve can be unscrewed. Screwed socket AF30 The protective sleeve and the pillot drilling can be reinstalled after all screws are fitted. After the post is erected with the post foot installed, it can be anchored on a concrete foundation with two or four cavity-wall ties or concrete bolts. Once the foot is installed on the socket, its height can be adjusted using an AF30 spanner. Please note: Do not screw the post foot to a height greater than 190, 290 or 450 mm respectively. 199
444 pagine | Valido fino a 12/2024 | Previous page | Pagina successiva
Selezionare la lingua
Questioni legali
Il produttore è esclusivamente responsabile del contenuto, del prezzo e dei dettagli degli articoli dei prodotti e delle offerte presentati nei cataloghi. Con riserva di modifiche tecniche e ottiche da parte del produttore e salvo errori.
Modulo di richiesta per prodotti speciali
Il servizio di acquisto di ToolTeam®
State cercando dei prodotti che sono mostrati nel catalogo ma che non possono essere acquistati direttamente online?Il nostro servizio di approvvigionamento sarà lieto di farvi un’offerta individuale e non vincolante.
