Remko Technical device handover LWM110-150 Duo/WSP140-180 Duo 1760103

Remko Technical device handover LWM110-150 Duo/WSP140-180 Duo 1760103

Sku: T-1514382
€525.62 (excl. legal VAT, excl. Shipping)
In stock,
ready for shipping within 48h
Piece
 
Ask a question
doneNo usage notice required
doneTechnical equipment handover
doneLWM110-150 Duo/WSP140-180 Duo
LWM110-150 Duo/WSP140-180 Duo
Content:
1 Piece
Shipping:
€167.98 Versandservice to United Kingdom
plus €18.00 stock transfer surcharge
Lieferung:
Between 4. Aug and 9. Aug with today receipt of payment
If you order in the next 21 hours and 37 Minutes with Versandservice

Provider:
Sales and delivery by ToolTeam Köln
Payment methods:
Returns:
Security:

Product data

Manufacturer:
REMKO GmbH & Co. KG
Condition:
NEW
Sku:
T-1514382
SKU manufacturer:
1760103
GTIN Code (EAN):
2000001514110
Weight:
0,00 Kg
All information relating to products from REMKO GmbH & Co. KG. Technical and optical modifications of the manufacturer and errors reserved. This page has been machine-translated, the original german version can be found here, please also note the Translation Disclaimer.

Product description

You will receive separate order confirmations for our CheckServ services with individualised scheduling agreements tailored to your planning and the conditions of use.
The services are invoiced with the payment condition ‘net cash’.

On request, we will also be happy to provide you with an offer for a maintenance contract.

The technical equipment handover includes the inspection and documentation of the entire refrigeration pipework (where visible), including pressure testing and evacuation. Furthermore, a comprehensive refrigeration equipment check is carried out. This includes checking the system pressures and all relevant values to ensure fault-free operation as well as instructing the system installer.

Visual inspection of the indoor and outdoor modules for assembly errors and damage
Visual inspection - refrigerant lines
Check of the electrical connection lines
Leak test with dried nitrogen
Evacuation, dehumidification and filling of the system
Calibration of indoor and outdoor parts
Technical handover of the unit and preparation of a report, briefing of the system installer

Prerequisites:
- Completed installation of the system
- Accident-proof accessibility
- Installed and connected E. - Mains supply
- installed and connected hydraulics

Notification must be given at least 14 days before the handover date!

Additional information

Product group:
10
Type:
DLS

Complete catalogs

The offer is aimed exclusively at business customers, companies, public institutions, tradesmen and freelancers. All prices in catalogues are exclusive of VAT, shipping costs and surcharges if applicable.
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.