Remko Surcharge for two-stage version HTL 200-FB 1072375 Remko Surcharge for two-stage version HTL 200-FB 1072375
Commercial customer offer**

Remko Surcharge for two-stage version HTL 200-FB 1072375

Sku: T-375811
€953.95 (excl. legal VAT, excl. Shipping)
€1,173.99 MSRP
In stock,
ready for shipping
Piece
 
Ask a question
doneversion HTL 200-FB
doneMade in Germany
Remko additional price two-stage version HTL 200-FB 1072375
Content:
1 Piece
Shipping:
€199.92 Versandservice to United Kingdom
plus €24.50 stock transfer surcharge
Lieferung:
Between 28. Jul and 2. Aug with today receipt of payment
If you order in the next 4 hours and 38 Minutes with Versandservice

Provider:
Sales and delivery by ToolTeam Köln
Payment methods:
Returns:
Security:

Product data

Manufacturer:
REMKO GmbH & Co. KG
Condition:
NEW
Sku:
T-375811
SKU manufacturer:
1072375
GTIN Code (EAN):
4026415496319
Weight:
0,00 Kg
All information relating to products from REMKO GmbH & Co. KG. Technical and optical modifications of the manufacturer and errors reserved. This page has been machine-translated, the original german version can be found here, please also note the Translation Disclaimer.

Product description

Mobile oil heating centre with separate burner.

Equipment housing in sturdy frame construction. Equipped with crane eyes and skids for easy transport. Frame, panelling and skids made of stainless steel.

Combustion chamber and heat exchanger partly made of highly heat-resistant special steel. Air intake via gill plates and intake nozzle in the fan section. Air outlet via round nozzles for pipe or hose connection. Low-maintenance high-performance special fans are used.

Included in the standard scope of delivery:
Fan oil burner, oil filter, 300 W oil preheater, regulation, control and safety devices fitted and electrically wired. Control box with operating switch, indicator lights and connection socket, electrical remote release, automatic direction of rotation control for the fan motor, rear intake protection grille.

Pipe sockets are available as accessories for the duct connection on the intake side.

The appliances comply with the relevant EU regulations and are CE-marked in accordance with the applicable directives.

Technical performance data:
MakeREMKO
Type designationHTL 200-FB
Design2-stage
Nominal heat load max. Nominal heat load max. [kW]150/200
Nominal heat output [kW]138/184
Air volume flow [m³/h]9120/12950
External pressure [Pa]480/540
FuelFuel oil EL/Diesel
Fuel consumption max. [l/h]15.4/19.5
Exhaust gas loss max. [%]9
Voltage supply [V/~/Hz]400/3N/50
Nominal current max. [A]9.3
Power consumption max. [kW]2.7/3.9
Exhaust gas connection diameter [mm]200
Air intake diameter [mm]*600
Air outlet diameter [mm]550
Dimensions (H/W/D) [mm]1370/800/2400
Weight with burner [kg]480
* (intake manifold, accessories)

Additional information

Product group:
3451
Type:
KAL

Complete catalogs

The offer is aimed exclusively at business customers, companies, public institutions, tradesmen and freelancers. All prices in catalogues are exclusive of VAT, shipping costs and surcharges if applicable.
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.