GEDA - Main catalog Page 105
Commercial customer offer**Top sellers from GEDA GmbH
4 | RACK AND PINION HOISTS | TRANSPORT PLATFORMS FOR PERSONS AND MATERIAL GEDA 1200 Z/ZP The large loading capacity of the GEDA 1200 Z/ZP transport platform allows quick and safe transport even of bulky and heavy construction materials. With two separate controls, the GEDA 1200 Z/ZP can be used simply as a material hoist with a lifting speed of 24 m/min or as a transport platform for passengers and materials with a lifting speed of 12 m/min. Various platform modules with different load capacities and sizes offer the right solution for any area of application and any challenge at a construction site. Despite the high load capacity of up to 1500 kg, the transport platform is guided on only one mast of the proven GEDA VARIO-MAST system. With an adapter mast, the GEDA 1200 Z/ZP can also be operated with the GEDA SVARIO-MAST. Technical data: 1500 kg 7 persons 130 m 12/24 m/min 2 x 3.0/6.1 kW/400 V/ 50 Hz/32 A TEMPORARY INSTALLATIONS 105
268 Pages | Valid until 12/2025 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
