Pneumax - Hauptkatalog Page 109
Commercial customer offer**Top sellers from Pneumax GmbH
Spool valves and solenoid valves Series 888 Assembly sequence 1 POSITION SEALS ON THE MODULAR SUB -BASE 3 5 POSITION THE FIRST MODULAR SUB-BASE USING THE 2 CAP HEAD SCREWS (ALLEN KEY 2.5) ASSEMBLE PRE-LUBRICATED ‘O’ RINGS TO END PLATE 2 POSITION THE PRE-LUBRICATED ‘O’ RINGS 4 ASSEMBLE SUB-BASE, ENSURE PRE-LUBRICATED ‘O’ RINGS STAY IN POSITION 6 ASSEMBLE FINAL SUB-BASE WITH SCREWS 7 8 FIX END PLATE WITH 4 SCREWS, TORX TYPE T10 (MAX TORQUE 0.7 Nm) ASSEMBLE PRINTED CIRCUIT BOARD IN THE MODULAR SUB-BASE HOUSING, PUSH UNTIL CONNECTION IS MADE WITH THE END PLATE 9 CHECK THE PRINTED CIRCUIT B OARD 10 IS IN THE CORRECT POSITION BY LOOKING TO SEE IF IT’S ALIGNED WITH THE SUB BASE SLOTS OR BY INSERTING A COIL INTO POSITION CLOSE THE LAST SUB -BASE USING PLUGS AND SCREWS (TORX T20) 11 FIT THE SEALS IN POSITION AND SLACKEN THE COIL RETAINING CAP BEFORE TIGHTENING THE V ALVE TO THE SUB BASE WITH THE CAP HEAD SCREWS (0.7 Nm). TIGHTEN THE COIL RETAINING CAP 12 IF USING THE BLANKING PLATES ON THE ELECTRICAL CONNECTOR TIGHTEN TO A MAX 0.35 Nm TORQUE Overall dimensions and technical information are provided solely for informative purposes and may be modified without notice 1 | 89 Air distributiOn 1
1106 Pages | Valid until 06/2025 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
