NIKO Product Catalog Light Crane Systems & Jib Cranes Page 10
Commercial customer offer**Top sellers from NIKO Technik GmbH
Multiple bridge cranes Multiple bridges can be used in the same long runway in order to accommodate multiple operators working at the same time. To prevent the crane bridges colliding buffer zones can be created using different methods. Creating buffer zones can enable multiple crane bridges to run within the same system without having to up-rate the runways. For example two 500kg crane bridges can run on 500kg runways, providing they are prevented from operating within the same support centres Permanent buffer zones using end stops LIG HT CRANE SYS TEM S Buffer zones using fixed spacers Buffer zone using mobile spacers Light crane systems 10 We reserve the right for technical amendments without obligation. The product pictures and drawings depicted in this catalogue do not always reflect all available sizes. Version January 2018
64 Pages | Valid until 12/2024 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
