TOX product catalogue Page 199
Commercial customer offer**Top sellers from TOX-DÜBEL
Building materials & Holding values Description & Area of Application Disc 75: Convex plate (Ø 75 mm) with trapezoid notches and flexible ribs Processing & Installation If DIN 1202 insulation boards are plastered, at least six wall plugs are to be used per m² 1. Drilling Result in concrete For insulation boards that are unplastered or behind cladding, four anchors per m² are sufficient Insulation boards may only be fastened to concrete ceilings if they have a total load of no more than 0.15 kN/ m² Drill into perforated brick in a rotary motion without hammering so that the webs are not broken 2. Set wall plug Use hammer drilling into concrete and solid masonry Through installation Insulation material 3. Screw in the screw 199
216 Pages | Valid until 12/2023 | Previous page | Next page
Choose your language
Legal issues
The manufacturer is exclusively responsible for the content, price and article details of the products and offers presented in the catalogues. Subject to technical and optical changes by the manufacturer and errors excepted.
Request form for special products
The ToolTeam® Procurement Service
Are you looking for products that are shown in the catalogue but cannot be purchased directly online?Our procurement service will be pleased to make you a non-binding and individual offer.
