Rothoblaas - Plates and Connectors Side 40

Kommercielt kundetilbud **
Rothoblaas - Plates and Connectors Side 40Side 41
Vis produkter
search
keyboard_arrow_up
/ 580

Produkter fra katalogside

-15% RothoBlaas Deutschland RothoBlaas ANKERPUNKT TIL ARBEJDE I HØJDEN OG ADGANG MED REB WING
WING
60,75 €
ekskl. forsendelsesomkostninger
71,15 € MSRP
-33% RothoBlaas Deutschland RothoBlaas PROTECTOR EVO SIKKERHEDSHJELM
PRO
93,30 €
ekskl. forsendelsesomkostninger
139,25 € MSRP
13 Variants
-32% RothoBlaas Deutschland RothoBlaas BESKYTTELSE AF REB EDGE
EDGE
36,49 €
ekskl. forsendelsesomkostninger
53,45 € MSRP
Se alle RothoBlaas Deutschland produkter
MOUNTING EXPOSED INSTALLATION WITH LOCK STOP 1 2 3 4 Place the connector on the main element and fasten the upper screws� When using LOCK STOP, position LOCK STOP and fasten the remaining screws� 6 5 Place the connector on the secondary beam and fasten the lower screws� When using LOCK STOP, position LOCK STOP and fasten the remaining screws� Hang the secondary beam from the main member by lowering it into place� Make sure that the two LOCK connectors are parallel to each other and avoid subjecting them to excessive strain during installation� 7 It is possible to install an uplift screw for Fup by drilling one hole Ø5 inclined at 45° in the upper part of the connector� A Ø5 screw must be installed in the hole� CONCEALED INSTALLATION 1 2 Carry out the routing on the main element� Place the connector on the main element and fasten all screws� 5 3 4 Place the connector on the secondary beam and fasten all screws� Hang the secondary beam from the main member by lowering it into place� Make sure that the two LOCK connectors are parallel to each other and avoid subjecting them to excessive strain during installation� 6 It is possible to install an uplift screw for Fup by drilling one hole Ø5 inclined at 45° in the upper part of the connector� A Ø5 screw must be installed in the hole� SEMI-CONCEALED INSTALLATION - CONNECTOR VISIBLE FROM BELOW 2 1 Place the connector on the main element and fasten all screws� 3 Cut a full depth routing on the secondary beam� Position the connector and fasten all screws� 40 | LOCK T MIDI | JOINTS FOR BEAM 5 4 Hang the secondary beam from the main member by lowering it into place� Make sure that the two LOCK connectors are parallel to each other and avoid subjecting them to excessive strain during installation� 6 It is possible to install an uplift screw for Fup by drilling one hole Ø5 inclined at 45° in the upper part of the connector� A Ø5 screw must be installed in the hole�

580 Sider | Gyldig indtil 12/2026 | |

PDF Download (261MB)
Gem siden som PDF
Anmod om tilbud
(uforpligtende)

Juridiske oplysninger

Tilbuddet er udelukkende rettet mod erhvervskunder, virksomheder, offentlige institutioner, håndværkere og freelancere. Alle priser i kataloger er eksklusive moms, forsendelsesomkostninger og eventuelle tillæg.
Producenten er kun ansvarlig for indhold, pris og artikeldetaljer for produkterne og tilbuddene i katalogerne. Med forbehold for tekniske og optiske ændringer og fejl fra producentens side.

Anmodningsskema til specialprodukter

Personal-Quote Personal-Quote

ToolTeam® indkøbsservice

Leder du efter produkter, der er vist i kataloget, men ikke kan købes direkte online?
Vores indkøbstjeneste vil med glæde give dig et uforpligtende og individuelt tilbud.


Udfyld alle obligatoriske felter (understreget med rødt)
keyboard_arrow_down
Udfyld alle obligatoriske felter (understreget med rødt)