Rothoblaas - Plates and Connectors Side 112

Kommercielt kundetilbud **
Rothoblaas - Plates and Connectors Side 112Side 113
Vis produkter
search
keyboard_arrow_up
/ 580

Produkter fra katalogside

-32% RothoBlaas Deutschland RothoBlaas AFBØJNINGSSKIVE I ALUMINIUM MED EN RULLE SINGLE
SINGLE
64,75 €
ekskl. forsendelsesomkostninger
95,55 € MSRP
2 Variants
Se alle RothoBlaas Deutschland produkter
"TOP-DOWN" INSTALLATION WITH ROUTING IN THE SECONDARY BEAM 1 Make the routing in the secondary beam and drill the holes (min. Ø25) for the MEGABOLT bolts. Position the ALUMEGA JV connector on the secondary beam paying particular attention to the correct orientation with reference to the "TOP" marking on the connector. Fasten the Ø5 LBS HARDWOOD EVO positioning screws. 2 3 Place the VGU washer in the slotted hole and, using the JIGVGU jig, drill a Ø5 pilot hole with a minimum length of 50 mm. Install the VGS screw and respect the 45° angle of insertion. Insert the MEGABOLT bolts in the following way: the first bolt must pass completely through both cores of the connector, while the other bolts must only pass through the first core. Position the ALUMEGA HP connector on the column, fasten the Ø5 LBS HARDWOOD EVO positioning screws (optional) and the HBS PLATE screws. Hook the secondary beam from top to bottom using the upper positioning notch in the ALUMEGA HP connector. 4 Fully tighten the MEGABOLT bolts with a 10 mm hexagonal wrench. Place the TAPS timber plugs in the circular holes and insert the closing board, hiding the connection for fire resistance requirements. "TOP-DOWN" INSTALLATION WITH ROUTING IN THE COLUMN 1 Place the three JV connectors assembled with template and bolts on the secondary beam. Once the Ø5 LBS HARDWOOD EVO positioning screws are fastened, remove the jigs and bolts. 2 3 Place the VGU washer in the slotted hole and, using the JIG-VGU jig, drill a Ø5 pilot hole with a minimum length of 50 mm. Install the VGS screw and respect the 45° angle of insertion. Insert the upper MEGABOLT bolt through the three JV connectors. Make the routing in the column and drill the holes (min. Ø25) for the MEGABOLT bolts. Use the jig for positioning the ALUMEGA HV connectors. Fasten the Ø5 LBS HARDWOOD EVO positioning screws. Place the VGU washer in the slotted hole and, using the JIG-VGU jig, drill a Ø5 pilot hole with a minimum length of 50 mm. Install the VGS screw and respect the 45° angle of insertion. 4 Hook the secondary beam from top to bottom using the upper positioning notch in the ALUMEGA HV connectors. Insert the remaining MEGABOLT bolts and screw them in completely with a 10 mm hexagonal wrench. 0 JIG INSTALLATION Place the JV connectors side by side and position the jigs at two rows of M12 holes in the connectors. Insert the MEGABOLT bolts through the M12 threaded holes, taking care to maintain the alignment between connectors. The use of the jig for HP and HV connectors is similar, it is recommended to use M12 nuts to avoid MEGABOLT bolts slipping out during installation. 112 | ALUMEGA | JOINTS FOR BEAM

580 Sider | Gyldig indtil 12/2026 | |

PDF Download (261MB)
Gem siden som PDF
Anmod om tilbud
(uforpligtende)

Juridiske oplysninger

Tilbuddet er udelukkende rettet mod erhvervskunder, virksomheder, offentlige institutioner, håndværkere og freelancere. Alle priser i kataloger er eksklusive moms, forsendelsesomkostninger og eventuelle tillæg.
Producenten er kun ansvarlig for indhold, pris og artikeldetaljer for produkterne og tilbuddene i katalogerne. Med forbehold for tekniske og optiske ændringer og fejl fra producentens side.

Anmodningsskema til specialprodukter

Personal-Quote Personal-Quote

ToolTeam® indkøbsservice

Leder du efter produkter, der er vist i kataloget, men ikke kan købes direkte online?
Vores indkøbstjeneste vil med glæde give dig et uforpligtende og individuelt tilbud.


Udfyld alle obligatoriske felter (understreget med rødt)
keyboard_arrow_down
Udfyld alle obligatoriske felter (understreget med rødt)