TOX product catalogue Strana 187
Nabídka komerčních zákazníků **Nejlépe prodávané z TOX-DÜBEL
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Building Buildingmaterials materials && Holding Holdingvalues values Tensile load Thermo Proof Mini Concrete C 20/25 Solid brick MZ 12 Vertically perforated brick ≥ Hlz 12 Bulk density ≥ 1kg/dm2 ø8 100kg* 50kg* 20kg* Cellular concrete ≥ P4 40kg* Shear load EPS 20 XPS 20 PUR Wood fibre insulation boards Rockwool 15kg** 15kg** 15kg** 15kg** 15kg** The anchoring depth of the wall plug must be observed Drilling method and drill hole cleaning must be adapted to the building material Approved wall plugs must be used for fixings where safety is of importance (see also www.tox.de/safety+loads) * The max. tensile load when used with Barracuda 5/25 in the Iso-Spacer is limited to 35 kg. ** Applies to insulation materials with plaster thicknesses ≥ 5mm Description & Area of Application Thermo Proof Mini M8/120 for insulation thicknesses of 50-120 mm Thermo Proof Mini M8/200 for insulation thicknesses of 50-200 mm When used with installation threaded rod M10 Fastening of e.g. downpipe clips When used without installation threaded rod Fastening of attachments with M6 threaded screws When used without installation threaded rod and Barracuda 5/25 Fastening of attachments with screws Ø 3 - 5 mm Processing & Installation 1. Shorten threaded rod 5. Drive rod into drill hole Fastening option A 7a. Put on cover cap & fit clip 2. Drilling 6. Screw in Fastening option B Fastening option C 7c. Unscrew the installation threaded rod 8c. Hammer in 5th Barracuda 7b. Unscrew the installation threaded rod 8b. Insert screw (M6) + attachment 9c. Fasten attachment with chipboard screw ø 3-5 mm 4. Screw on wall plug 9b. Tighten screw (M6) 10c. Result Shorten threaded rod to the required length Make hole with Ø 14 mm in the building material (drill hole depth 90 mm + tETICS) Clean drill hole Screw Barracuda 14/70 onto the threaded rod with max. two turns Hammer the pre-fitted Thermo Proof Mini into the drill hole until the Iso-Spacer is flush with the outer wall Insulation material 3. Clean drill hole Usage Example A: Rainwater downpipe fastening Put on TOX Flexi Cap cover cap and fit pipe clip Usage Example B: Installation with M6 screw for miscellaneous Unscrew installation threaded rod Fastening the attachment with M6 screw Usage Example C: Installation with screws for miscellaneous Unscrew the installation threaded rod Hammer the Barracuda 5/25 into the Iso-Spacer Fasten the attachment with a Ø 3.0 - 5.0 screw Screw in until the collar of the Iso-Spacer is flush with the plaster 187
216 Stránky | Platí do 12/2023 | Previous page | Další stránka
Vyberte si jazyk
Legální problémy
Výrobce je výhradně zodpovědný za obsah, cenu a detaily produktů a nabídek uvedených v katalozích. Technické a optické změny výrobce a chyby jsou vyhrazeny.
Formulář žádosti o speciální produkty
Služba nákupu ToolTeam®
Hledáte produkty, které jsou uvedeny v katalogu, ale nelze je zakoupit přímo online?Naše služba nákupu vám ráda zpracuje nezávaznou a individuální nabídku.
