BWG Bauteam main catalog hand tools Strana 32
Nabídka komerčních zákazníků **Produkty z katalogové stránky
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
Bez dopravy
TILE PROCESSING Brief instructions for tiling with the TWISTER LEVEL system embed the tile in the tile cement bed then slide one side of the threaded TWISTER LEVEL “Base” ground plane under the embedded tile (2.) - place the adjoining tile at the opposite part of the TWISTER LEVEL “Base” ground plane to achieve a joint (3.) - turn TWISTER LEVEL “Knob” onto the treads until a resistance felt - the first level is reached - turn further now until both tiles are on the same level and no displacement is notable (4.) - continue procedure as indicated in (1) - (3) for the complete area to be laid - then allow the tile adhesive to harden (1.) - (5.) final steps: - unscrew the TWISTER LEVEL “Knobs” or leave them mounted - remove the threaded tabs / TWISTER LEVEL “Knobs” (they have a predetermined breaking point) in direction of the joint with work boots or knock them off e.g. by a soft hammer - TWISTER LEVEL “Knobs” are reusable! Page 18 ©BWG Bauteam Catalogue 2022
221 Stránky | Platí do 06/2023 | Previous page | Další stránka
Vyberte si jazyk
Legální problémy
Výrobce je výhradně zodpovědný za obsah, cenu a detaily produktů a nabídek uvedených v katalozích. Technické a optické změny výrobce a chyby jsou vyhrazeny.
Formulář žádosti o speciální produkty
Služba nákupu ToolTeam®
Hledáte produkty, které jsou uvedeny v katalogu, ale nelze je zakoupit přímo online?Naše služba nákupu vám ráda zpracuje nezávaznou a individuální nabídku.
